What the six lines supply, and where they stop
A capability list is only useful if it says what is out of scope. One schedule carries the six lines with the figure each is quoted on; three bands after it carry the boundary, the packing, and the terms a first order runs on.
· One order, one document number, six different workshops behind it.
Six lines, and the figure each is quoted on
| Line | Supplied as | Decisive figure | First order |
|---|---|---|---|
| Leak detectionLine 01 | Sensing rope cut to length and terminated, point sensors, controllers, accessories | 500 m per channel | 1 carton · 500 m custom |
| Coolant filtrationLine 02 | Housings, cartridges in eight grades, water quality transmitters | 1 µm absolute | 1 carton |
| Hose and pipingLine 03 | Hose assemblies, fittings, seals and quick disconnects | 1.38 MPa ≈ 200 psi | 500 m on custom lengths |
| Thermal materialsLine 04 | Grease, pads, phase change material and graphite, die-cut to shape | 1.0–15.0 W/m·K | 1 carton |
| TelemetryLine 05 | Flow, differential pressure, level and water quality instruments, ranged to order | 4–20 mA | 1 unit |
| Fill and flushLine 06 | Service carts, filtration units, sampling points, flushing to a target grade | ISO 4406 17/15/12 | 1 unit |
Custom lengths and custom terminations are the exception: those run from 500 m, because the tooling is set up per size. Everything else ships from a carton or a single unit.
· A service cart as it ships: housings, valves, pump and gauge on one frame.
· Cable assemblies are terminated to the ordered length, not cut to a nominal one.
· Locating sensing cable. The detection length is quoted per channel, not per reel.
What this sheet does not supply
· The manifold itself is not supplied. What connects to it is.
· The joint between the machine and the loop is exactly the part we do supply.
Design, installation and commissioning sit with the contractor
- System design: the circuit, the flow balance and the heat load are designed by the engineering party of record, against the equipment makers' data.
- Installation: performed on site by the contractor of record, to the site's method statement and permit conditions.
- Commissioning: flushing, filling and proving the loop is a site activity with its own sampling and sign-off, and it is not sold from this sheet.
What is supplied to those three activities is the material: parts, drawings, the cleanliness target, and the document pack that the contractor files.
· What leaves this sheet: the drawing and the part it describes.
· Whoever installs it is named in the contract. It is not named on this sheet.
Documents and packing that ship with an order
· One drawing per size, issued with the quotation. Marking on the crate follows the same number.
· Crate, strapping and marks. The reel is fixed so it cannot shift in transit.
· Five documents, one per function. They are checked against each other before the crate closes.
How a first order runs
Large orders can run on a letter of credit at sight instead of the deposit split. Nothing in this band is a stock commitment: the lead time starts when the sample is signed.
· Instruments are ranged to the loop before they are boxed, so the range on the label is the range in use.
· Die-cut parts are tooled per shape. A new outline is a new tool, which is why it carries its own lead time.
Four documents are held for this sheet. Tick the ones you need.
Tick a document, name the line and the quantity, and the file comes back attached.
One business day, with the file attached.
Nothing else on this sheet is promised. Stock, price and delivery dates are not promised here.