Not supplied
Coolant distribution units, cold plates, chillers and pumps sit outside the catalogue.
>
Skip to contentShenzhen, Guangdong, China · ships from Shenzhen · local time UTC+8
One address. No telephone number is published, and none invented for this page. No street address either: it appears on the commercial invoice once an order is placed.
Send the model code, or the loop problem instead.
Shenzhen, Guangdong · the city the goods ship from
Every code maps to a drawing revision.
Glycol concentration by volume. Most first messages miss it.
Size and thread or flange standard.
Annual quantity, so pricing carries a price break.
Destination country and the incoterm you work on.
A photograph saves a round trip; a drawing saves two.
| Question type | Report | Presented as |
|---|---|---|
| Filtration | Loop volume, the current element micron rating, the differential pressure across it, and the last coolant sample result. | psid · µm · µS/cm |
| Leak | What the panel reports, the rooms or runs in scope, the loop length and the glycol percentage. Say whether the space has downflow air units: 1.8 m of clearance from the discharge prevents most nuisance alarms. | µA · m · % |
| Thermal | The gap, the assembly pressure and the target impedance, rather than a W/m·K figure on its own. | mm · °C·cm²/W |
A symptom message with no part number works.
A first reply arrives inside one working day. Where a figure needs a test record or a check at the manufacturing end, the reply says which record is being pulled and when it will arrive.
A quotation holds for 30 days and names the incoterm, the currency, the model codes with their drawing revisions, the MOQ and the lead time.
| First reply | 1 working day |
| Sent after 18:00 Friday, UTC+8 | answered Monday |
| Quotation validity | 30 days |
| Quotation fields fixed at issue | 6 |
Dimensional drawing with its revision · datasheet link per code · burst ratio · MOQ and lead time
Attachments or open PDF links. Nothing sits behind a form. A sample request carries its lead time and test record.
An enquiry that cannot be served gets one reply saying so.
Coolant distribution units, cold plates, chillers and pumps sit outside the catalogue.
Commissioning, flushing and leak repair are not services. The fill and flush line supplies the equipment; the operator runs it.
Design authority for the loop stays with the buyer's engineer.
A check of the schedule for bore, thread and material conflicts across the product lines.
Four lines are enough to start. What comes back is the specification sheet, the drawing and the datasheet for the code.
Leave your work email and the model code. One datasheet per model, with position resolution and locating repeatability stated as separate rows.