Reference data

Reference pages written for the person who signs the commissioning sheet

A product page says what a model does; a commissioning sheet asks what the loop must hold. Sealing is where loops fail: a compression fitting cold-flowing under sustained clamp load, a seal face abraded by 5 µm particulate. Neither appears on a heat-rejection curve.

Reference pages 5
Parameters 8
Loop types 2
Micron categories 3

protection rating · commissioning staging · strainer rating

Ask for the specification sheet

02 / Target bands

Every routine loop number

Guide column: the coolant quality targets and the leak detection selection guide.
Parameter DI technology loop Glycol or facility water Read by
pH 8.0–9.5 7.0–9.0 EMS-CF-WQ-PH
EC 0.2–20 µS/cm 50–300 µS/cm EMS-CF-WQ-C
Chloride <5 ppm <50 ppm Lab panel
Hardness <20 ppm <50 ppm Lab panel
Suspended solids <3 ppm <3 ppm EMS-CF-WQ-PC
Turbidity <1 NTU <1 NTU EMS-CF-WQ-NTU
Bacteria <100 CFU/mL <1 000 CFU/mL Lab panel
Leak setpoint 150 µA, 20 s 150 µA, 20 s EMS-LD-C16
Conductivity bands on a logarithmic axis: the de-ionised band sits below the glycol band 0.2–20 50–300 DI glycol µS/cm
Conductivity · the two bands are not in conflict
03 / Selection criteria

Each threshold, labelled by the kind of figure it is

Product line Criterion Threshold Figure type
Hose and fittings burst margin ≥3× maximum allowable ratio
Thermal materials impedance at pressure 0.02 °C·in²/W at 30 psi condition
Coolant filtration absolute rating, finest channel 7–10× smaller · 2× full flow · 10× side-stream protection
Coolant filtration unit-inlet guard 500 µm class strainer rating
Leak detection zones per controller 32 virtual zones capacity
Commissioning cleanliness class before fill zero particles ≥50 µm acceptance limit
Commissioning flush sequence 100 → 50 → 25 µm staging
04 / Cadence

Chemistry is a calendar item

Sample the loop

Every 50–100 days, then after any make-up addition or vacuum fill.

Test the cable

Monthly where nuisance alarms are expensive, annually otherwise.

Change the element

At 35 psid, not on a date, inside the 60 psid collapse limit.

Reserve alkalinity

1.4 mL per ASTM D1121; the annual check on the inhibitor package.

Dry the cable

A wet-washed sensing cable needs 6–48 hours before it goes back down.

Book the next sample

A date starts the panel, not a fault.

05 / Labelling

Labelling rules before a number is quoted

Rule Without the label With the label
Loop type travels with the number 0.2–20 µS/cm at pH 8.0–9.5 50–300 µS/cm at pH 7.0–9.0
A micron figure says which one 5 µm protection rating · commissioning staging · strainer rating
06 / Scope

What is supplied, and what is not

Supplied: filter elements and side-stream skids, water-quality instruments, leak-detection cable and controllers, hose and fittings, thermal interface materials, telemetry kits, fill-and-flush equipment. Not supplied: coolant distribution units, and cold plates.

30–150 kPa technology-cooling pressure drop · 5 s make-up alarm

Unit numbers are context: our instruments read the same loop.
Line Status
Filter elements and side-stream skids Supplied
Water-quality instruments Supplied
Leak-detection cable and controllers Supplied
Hose, fittings, thermal materials Supplied
Telemetry kits, fill-and-flush equipment Supplied
Coolant distribution units Not supplied
Cold plates Not supplied
07 / Datasheets

A model code, a PDF, a specification table

  • EMS-CF-WQ-C Conductivity cell, both cell constants PDF
  • EMS-LD-R500 Locating rope, 500 m PDF
  • EMS-HP-E8-20 EPDM hose, −8 dash PDF
  • EMS-TM-G35 Thermal grease, 3.5 W/m·K PDF
  • EMS-TL-K300 Telemetry kit, 300 kW row PDF
  • EMS-FF-FL75 Flush skid, staged filtration PDF
Specification request

Ask for the specification sheet

Leave your work email and the model code. One datasheet per model, with position resolution and locating repeatability stated as separate rows.

  • A specification table of at least ten rows per product family, and a downloadable PDF for every model listed.
  • Seal-life data where it decides the choice: permeation rate, compression set and fluid compatibility.
  • One working day for a reply, from an engineer rather than a catalogue autoresponder.
Reply within one working day