EMS-Trade
Cooling
Loop consumables

Document ECT-01 · REV C · ISSUED 2026-09 Six lines · 48 sheets

A process cooling water line in a cleanroom: a polished stainless line running to a process tool with a cartridge housing and a sampling valve on it, the floor clean and uncluttered, the lower part of the frame in shadow
Sheet 42 · Semiconductor · the quality side of the loop

Particles and ions reach the product, not the floor

On a fab loop the fluid touches the yield. Filtration is specified to an absolute rating, wetted parts are declared as 316L and PFA, and a joint that weeps is a stop that has not been scheduled yet.

Request the specification file One business day, with the file attached
0.05–100 µmGrade band on one housing
1 µmAbsolute rating in circuit
17/15/12ISO 4406 before the loop is closed
316L · PFAWetted material, declared
01

Four facts that decide how a fab loop is specified

Pain statement · the conditions this industry actually runs under

Particles
Filtration is not a housekeeping detail here. Particle count in the loop is read against the yield of the tool it cools, and the cartridge rating is specified in the same sentence as the process.
Metal ions
A wetted metal surface that sheds ions into the fluid is a contamination source, not a wear item. Wetted parts are specified as 316L and PFA-lined, and the certificates travel with them.
Cleanroom rules
Loop work is done to the room's rules: no unpacking outside a transfer airlock, no cut lengths on the fab floor, packaging that goes back out with the fitter.
Cost per hour
An hour of unplanned downtime on a production tool runs into the hundreds of thousands. A joint that weeps slowly is not a slow problem; it is a stop that has not been scheduled yet.
02

What the fluid touches on its way to the tool

Pain plates · the particles the element holds, the wetted surfaces, and the reading that is watched

A cartridge cut open on a clean tray with fine dark particles caught in the pleats, an unused cartridge beside it for comparison, no other objects on the tray
FIG 1 ·

Particle count in the loop is read against the yield of the tool it cools.

A black elastomer seal and a length of polished stainless tube laid side by side on a clean tray, both surfaces clean and free of marks
FIG 2 ·

316L and PFA are declared on the drawing, because a wetted surface that sheds ions is a contamination source.

The meter is the reading the room runs on. It is chosen so that it stays readable when the branch is boxed in behind a tool, and so that a change in it is visible to somebody who is not standing at the tool.

An electromagnetic flow meter with a transmitter head on a flanged body, photographed on a neutral ground on its own
FIG 3 ·

The readings the room is run on are flow, pressure drop and conductivity, all taken on the same schedule.

02

What we will put in writing for a fab loop

Schedule S · acceptance conditions for the loop, not for the CDU

Schedule S · the conditions this industry is quoted on
No Condition Value Unit Basis
01 Cartridge grade bandFilter in circuit 0.05–100 µm Absolute ratings, selectable on one housing
02 Absolute rating in circuitFilter grade 1 µm The rating the loop is qualified on, not a nominal one
03 Cleanliness at chargeLoop fluid 17/15/12 ISO 4406 Sampled and gated before the tool is connected
04 Wetted material, metal partsHousings and fittings 316L grade Stated on the drawing and on the EN 10204 3.1 certificate
05 Wetted material, flexible partsHose and seals PFA liner Elastomer choice declared for the fluid in use
06 Shell design pressure304 and 316L 1.0 MPa Hydrostatic proof per batch
07 Hose working pressureDASH −4 to −10 1.38 MPa About 200 psi, burst above 5.5 MPa
08 Hose temperature bandWater-based coolant −40 to +99 °C The band claimed for this application
09 Filter change differentialAcross the housing 0.5–0.7 bar Read on two impulse tubes rather than on a gauge by eye
10 Flame rating on the coverHose outer layer V-0 UL 94 Outer cover compound only, not the liner

The value column is the figure we will be held to, and every figure in it is one this loop is bought against. Where a tolerance is not published, the cell stays empty rather than carrying an estimate.

03

Where the two pieces of evidence come from

Evidence plates · the sample drawn in the room, and the rope run along the base

A sampling valve with a clear sample bottle on a clean bench, the fluid clear inside the bottle, a short polished line behind the valve and no paper on the bench
FIG 4 ·

The cleanliness gate is a sample taken in the room, not a claim made about the fluid.

A braided sensing cable run along a branch pipe under a tool base, clipped to the pipe supports and turning into a terminal box on the base
FIG 5 ·

The rope runs at the tool base, where a weep would reach the floor of the room.

05

The loop as one tool is actually fed

Section through the branch · consumables called out where they sit

1 2 3 4 5 6 one tool, one branch · every wetted part declared

Consumables on this section

  1. 1 ·Main in the sub-fab, out of the cleanroom envelope
  2. 2 ·Cartridge housing on the branch, 1 µm absolute in circuit
  3. 3 ·Tool base connection, quick disconnect pair where it can be reached
  4. 4 ·Drip tray under the base connection, wiped down on every visit
  5. 5 ·Sampling valve and conductivity probe in the run
  6. 6 ·Locating sensing cable along the base, under the joints
06

The three files this industry is held as

Archive form · no client name and no project name is held on any of them

Three configurations recur on fab loops. Each is held as a file: the loop drawing, the wetted material list, the cleanliness gate and the sample that cleared it.

A single branch leaving a main and running down to a tool base, with one joint and one sampling point on it and no redundant bends
FIG 6 ·

File A. One tool, one branch, one sampling point.

A short hose on a bench with a fitting at each end, laid straight with a rule beside it, on a clean mat
FIG 7 ·

File B. The short flexible link, made to length off site so nothing is cut in the room.

A mobile filter trolley in a clean corridor: two cartridge housings on the frame, a pump and a gauge, hoses at both ends, wheels and lines clean
FIG 8 ·

File C. Flush and fill at the tool side, on a loop that was never opened on the fab floor.

07

The standards a fab loop is written against

Conformity · the document set held for this sheet

OCP
Cold Plate Coolant Base Specification v1.3, with the Reservoir and Pumping Unit Spec v1.0 for the facility side
ASHRAE
Water Cooled Servers, supply-water classes W17–W45.
T/CAEE 085—2026
EPDM hose and hose assemblies for cold-plate liquid cooling, water-based coolant
ISO 4406
17/15/12 before the tool is connected, verified on a sample drawn in the room
ISO 9001
Held by the partner carrying the work, not claimed here as ours
EN 10204 3.1
Material certificates for every metal part, so the wetted grade is stated rather than assumed
UL 94 V-0
Flame rating on the hose cover compound
RoHS · REACH
Elastomer and seal material compliance
CE · UKCA
CE marking and UKCA, for European delivery
04

How those standards are demonstrated

Evidence plates · the batch bench, the interface drawing, and how the parts ship

A hydrostatic and burst test bench with a coiled braided hose under test behind a steel guard, a pressure gauge and control cabinet at the side
FIG 9 ·

1.38 MPa working and burst above 5.5 MPa, proven per batch and recorded per batch.

A metal fitting on a neutral ground with its thread and sealing face visible, photographed alone
FIG 10 ·

Every interface dimension is published, so nothing is made to fit on the fab floor.

Parts for a fab arrive bagged against the joint they belong to, with the certificates and the test record in the same box, so nothing is unpacked on the fab floor and nothing goes back out as waste an airlock has to handle.

A batch of parts on a clean bench: seals each in a lined bag with the neck tied, a stack of printed record sheets and a plain packaging box beside them
FIG 11 ·

Bagged per joint, with the certificate and the test record in the same box.

05

What every one of those files consumes

Specimen strip · real parts, one cell each · contain fit, the part is never cropped

A black elastomer profile gasket for a rectangular joint, its moulded corner sections and locating tabs visible against a black ground
SP 1 · Profile gasket Wetted surface, moulded not spliced
Dimension drawing of a fitting with callout letters on the body and the bore, no brand and no model number
SP 2 · Fitting drawing Every interface dimension published
A mobile filter trolley with two stainless housings, a pump, valves with blue handles and a pressure gauge, photographed on a white ground
SP 3 · Flush and fill Two housings, valve and gauge on one frame
Seven green O-rings laid out on a light ground, one ring separated from the group
SP 4 · Seal set Replaced at every break in the run

SP 1–4 ·Supply-side samples: a moulded profile gasket with no spliced joint on the wetted face, a fitting drawing with every interface dimension published, a flush and fill trolley with two housings on one frame, and the seal set that is replaced at every break in the run.

00

What stops at the boundary of this sheet

Scope · the part of the loop that is not supplied here

We supply the loop: hose, couplings, seals, filtration, sensing rope and the instruments that read them. The cooling distribution unit and the cold plate are not ours to quote, and neither is the installation, the design or the commissioning of either.

On a fab loop the boundary is the tool frame: the process side, the tool internals and the facility supply are not ours, and the branch up to the connection is.

Supplied the loop itselfNot supplied CDU · cold plate · installation
The side of a process tool in a cleanroom: its internal cooling loop and heat exchanger enclosed in the tool frame, with the external pipework stopping at the frame connection
FIG 12 ·

The tool and its internal cooling belong to the tool maker. What we quote is the branch up to the frame.

00

The other sheets in this set

The same schedule, five different industries · one row per sheet

01 Colocation A hall that cannot be shut down, on a return shared with other tenants. SLA 99.99% · 52.6 min
02 Hyperscale & AI training Rack power from 10–15 kW to 100 kW+, and a coupling pair added with every rack. 10–15 → 100 kW+
03 HPC & research One loop, two equipment generations, 5–10 years, and no baseline sample. 5–10 years
04 Edge & telecom No round, no one on call, and a leak that can run for weeks. −20 to +55 °C
05 EV & power electronics Bench loops broken and remade weekly, and glycol errors that surface weeks later. 1.38 MPa · −40 to +99 °C

Every sheet in this set is written in the same order: the pain, the schedule it is quoted on, the loop as it is built, the standards, and the configuration files held for it.

DOCUMENT REQUEST

Four documents are held for this sheet. Tick the ones you need.

Tick a document, name the tool or the branch you are planning against, and the file comes back attached.

The only promise on this page

One business day, with the file attached.

Nothing else on this sheet is a commitment. Price, stock and lead time are not promised here.

The four documents held for this sheet laid out on a bench: a folded specification sheet, a certificate sheet, a test report and a rolled outline drawing
FIG 13 · Specification sheet · EN 10204 3.1 certificates · burst and hydrostatic report · outline drawings
If the form cannot send, sales@ems-cool.com takes the request instead. A request is never accepted and then dropped.