Particles and ions reach the product, not the floor
On a fab loop the fluid touches the yield. Filtration is specified to an absolute rating, wetted parts are declared as 316L and PFA, and a joint that weeps is a stop that has not been scheduled yet.
Four facts that decide how a fab loop is specified
What the fluid touches on its way to the tool
Particle count in the loop is read against the yield of the tool it cools.
316L and PFA are declared on the drawing, because a wetted surface that sheds ions is a contamination source.
The meter is the reading the room runs on. It is chosen so that it stays readable when the branch is boxed in behind a tool, and so that a change in it is visible to somebody who is not standing at the tool.
The readings the room is run on are flow, pressure drop and conductivity, all taken on the same schedule.
What we will put in writing for a fab loop
| No | Condition | Value | Unit | Basis |
|---|---|---|---|---|
| 01 | Cartridge grade bandFilter in circuit | 0.05–100 | µm | Absolute ratings, selectable on one housing |
| 02 | Absolute rating in circuitFilter grade | 1 | µm | The rating the loop is qualified on, not a nominal one |
| 03 | Cleanliness at chargeLoop fluid | 17/15/12 | ISO 4406 | Sampled and gated before the tool is connected |
| 04 | Wetted material, metal partsHousings and fittings | 316L | grade | Stated on the drawing and on the EN 10204 3.1 certificate |
| 05 | Wetted material, flexible partsHose and seals | PFA | liner | Elastomer choice declared for the fluid in use |
| 06 | Shell design pressure304 and 316L | 1.0 | MPa | Hydrostatic proof per batch |
| 07 | Hose working pressureDASH −4 to −10 | 1.38 | MPa | About 200 psi, burst above 5.5 MPa |
| 08 | Hose temperature bandWater-based coolant | −40 to +99 | °C | The band claimed for this application |
| 09 | Filter change differentialAcross the housing | 0.5–0.7 | bar | Read on two impulse tubes rather than on a gauge by eye |
| 10 | Flame rating on the coverHose outer layer | V-0 | UL 94 | Outer cover compound only, not the liner |
The value column is the figure we will be held to, and every figure in it is one this loop is bought against. Where a tolerance is not published, the cell stays empty rather than carrying an estimate.
Where the two pieces of evidence come from
The cleanliness gate is a sample taken in the room, not a claim made about the fluid.
The rope runs at the tool base, where a weep would reach the floor of the room.
The loop as one tool is actually fed
Consumables on this section
- 1 ·Main in the sub-fab, out of the cleanroom envelope
- 2 ·Cartridge housing on the branch, 1 µm absolute in circuit
- 3 ·Tool base connection, quick disconnect pair where it can be reached
- 4 ·Drip tray under the base connection, wiped down on every visit
- 5 ·Sampling valve and conductivity probe in the run
- 6 ·Locating sensing cable along the base, under the joints
The three files this industry is held as
Three configurations recur on fab loops. Each is held as a file: the loop drawing, the wetted material list, the cleanliness gate and the sample that cleared it.
File A. One tool, one branch, one sampling point.
File B. The short flexible link, made to length off site so nothing is cut in the room.
File C. Flush and fill at the tool side, on a loop that was never opened on the fab floor.
The standards a fab loop is written against
How those standards are demonstrated
1.38 MPa working and burst above 5.5 MPa, proven per batch and recorded per batch.
Every interface dimension is published, so nothing is made to fit on the fab floor.
Parts for a fab arrive bagged against the joint they belong to, with the certificates and the test record in the same box, so nothing is unpacked on the fab floor and nothing goes back out as waste an airlock has to handle.
Bagged per joint, with the certificate and the test record in the same box.
What every one of those files consumes
SP 1–4 ·Supply-side samples: a moulded profile gasket with no spliced joint on the wetted face, a fitting drawing with every interface dimension published, a flush and fill trolley with two housings on one frame, and the seal set that is replaced at every break in the run.
What stops at the boundary of this sheet
We supply the loop: hose, couplings, seals, filtration, sensing rope and the instruments that read them. The cooling distribution unit and the cold plate are not ours to quote, and neither is the installation, the design or the commissioning of either.
On a fab loop the boundary is the tool frame: the process side, the tool internals and the facility supply are not ours, and the branch up to the connection is.
The tool and its internal cooling belong to the tool maker. What we quote is the branch up to the frame.
The other sheets in this set
Every sheet in this set is written in the same order: the pain, the schedule it is quoted on, the loop as it is built, the standards, and the configuration files held for it.
Four documents are held for this sheet. Tick the ones you need.
Tick a document, name the tool or the branch you are planning against, and the file comes back attached.
One business day, with the file attached.
Nothing else on this sheet is a commitment. Price, stock and lead time are not promised here.